The team pays for an application but still moves information between three spreadsheets. Building a new system looks like the immediate answer. First establish why the work remains outside the application: a missing capability, integration or shared operating rule?

Describe a complete case rather than a feature list

Choose a normal case, an incomplete case and an important exception. Record who starts it, what information is used, who approves it and the required outcome. Use the same cases to assess each option.

GOV.UK recommends considering total cost, data control and the ability to change when choosing technology. Its guidance uses prototypes to test needs and integrations. It addresses UK public services; the comparison below adapts those questions to a business project.GOV.UK Service Manual

Compare three options against the same workflow

Exploration framework rather than a universal verdict
OptionWhen to test itWhat must be demonstrated
Existing applicationThe workflow resembles a model already supportedMandatory requirements and a usable export
Configuration or integrationUseful systems exist but transfer or approval remains manualAvailable access, failure handling and integration limits
Custom developmentA critical requirement remains unmet after testing alternativesA working proof, operation and maintenance arrangements

Total cost includes life after launch

  • Configuration, development and required data migration
  • Team time for preparation, testing and training
  • Subscriptions, hosting and external services
  • Support, fixes and security updates
  • Provider changes, data export and operational continuity

Compare the same period and assumptions for every option. Separate confirmed costs from estimates and identify what changes with user numbers or workload. A low initial quote does not describe operating cost on its own.

What to prove before selecting an option

Where is the main gap?

Choose a verified problem. This proposes a test rather than automatically approving an investment.

Your choice stays on this page and clears on reload

Check the ability to change at handover

Establish account ownership, agreed rights to code and materials, data export and who can continue maintenance. Check these conditions in the offer and final agreement. Custom development does not automatically transfer every right, and a promised export still needs testing.

Sources and further reading

GOV.UK Service Manual: Choosing technology and testing assumptions

UK public-service guidance on total cost, data control, prototypes and the ability to change

Accessed

FAQ

Does custom software remove subscription costs?

Not automatically. Hosting, maintenance, support and third-party services may still have recurring costs. Request an inventory of recurring charges and their owners.

If an existing app covers almost everything, should we build the rest?

First establish the significance of the gap and configuration or integration options. A rare exception may have a controlled manual solution; a repeated critical step may justify another approach.

The process defines what needs building

A development project can begin with requirements, a limited proof and integration checks against existing applications.

Discuss application developmentView service